WATER SUPPLY ADVISORY
WHAT: CLOSING OF 2″ ISOLATION VALVE AT PUTRIDO, BALAYANG
WHEN: SUNDAY, JULY 12 2026, 6:50 AM UNTIL FURTHER NOTICE
AFFECTED AREAS:
- PUTRIDO, BALAYANG
DUE TO THE STRONG WATER CURRENT BROUGHT ABOUT BY TYPHOON INDAY, THE 2″ MAINLINE CROSSING AT PUTRIDO, BALAYANG BRIDGE WAS DISPLACED BY THE FORCE OF THE FLOODWATERS, RESULTING IN DAMAGE TO THE PIPELINE AND THE INTERRUPTION OF WATER SERVICE IN THE AFFECTED AREA.
PLEASE BE ASSURED THAT THE DAMAGED MAINLINE WILL BE REPAIRED AS SOON AS THE WATER CURRENT IN THE AREA SUBSIDES AND CONDITIONS ARE SAFE FOR OUR PERSONNEL TO CARRY OUT THE NECESSARY REPAIR WORKS.
WE APOLOGISE FOR THE INCONVENIENCE.
CLICK HERE:
https://www.facebook.com/share/p/14heh4zvi5L/